Outside the property
D1 Chimney stacks
The property features four traditional red brick chimney stacks, one to each side of the front and rear roof slopes. The stacks are constructed of solid red brick masonry and are capped with multiple clay chimney pots. The right-hand stacks are shared with the adjoining property, which is common in semi-detached properties. Most of the pots remain open to the elements, while others have been capped or fitted with ventilated cowls. The junctions of the stacks and the adjoining roof are weathered with lead flashings.
The brickwork is generally in fair condition for its age, but with notable localised deterioration. There is visible spalling to multiple bricks, which is likely the result of prolonged exposure to driving rain and freeze-thaw cycling. Spalling occurs when moisture enters the brickwork, freezes and expands, causing the brick face to break away. In these instances the brick faces are crumbling or missing altogether, and several bricks have deteriorated to such a degree that replacement rather than repair is likely to be required. This is particularly evident to the front left-hand stack, where numerous bricks are affected.
The use of cement-based mortar is evident in areas of past repointing. This is a common cause of accelerated spalling in older red brickwork, as the hard, impermeable cement traps moisture within the more porous bricks rather than allowing evaporation through the mortar joints. In contrast, traditional lime mortar is softer, more breathable and better suited for use in heritage properties, allowing moisture to escape and reducing brick deterioration over time.
Read the full entry (6 more paragraphs)Show less
A slight lean was noted to the front left-hand stack, which is slender in design and positioned directly at the gable edge. While the lean appears minor and is within acceptable tolerances for a stack of this height and age, it should be monitored over time. Chimney stacks are vulnerable to leaning due to weathering, settlement and thermal expansion, and tall, exposed stacks are particularly susceptible. Ongoing weathering, erosion of mortar joints or the presence of sulphate attack may gradually worsen such a lean if not maintained.
The majority of the chimney pots are uncapped, which exposes the flue openings to rainwater ingress. This significantly increases the risk of internal dampness, particularly where disused flues terminate in redundant or unventilated fireplaces. Open pots can also allow birds and debris to enter and obstruct the flues.
The mortar flaunching is the shaped bed that secures the chimney pots and sheds water. These areas could not be fully inspected from ground level. However, given the lack of maintenance and the exposed nature of the flaunching, we suspect that sections may be deteriorated or cracking. This is common in older properties, where exposure to weather gradually erodes the protective mortar bedding.
The lead flashings at the chimney and roof junctions are present and traditionally detailed, appearing to be chased into the brickwork. However, they are sited below the level of the roof coverings and do not visibly lap over the tiles. Ideally, lead flashings should sit above the roof coverings, overlapping by 65 to 75mm, and be used in combination with stepped soakers underneath to create a watertight seal. Defective weatherproofing at this junction is a common source of water ingress, particularly where flashings are inadequately dressed or soakers are omitted. We recommend that the chimney and roof abutments are inspected from close range during future roof works, with improvements undertaken where required.
Given the extent of localised spalling, the historic use of cement mortar and the presence of open chimney pots, a programme of remedial works is advised. Repointing should be carried out using lime mortar, such as hydraulic lime or lime putty depending on exposure, to ensure better compatibility with the original brickwork and reduce the risk of future damage from moisture retention and thermal movement. Spalled bricks can be replaced, as has been done on the rear stack using a slightly different brick; ideally, reclaimed or carefully matched new red bricks that respect the character of the existing masonry should be used. Redundant flues should be properly capped and vented, and the chimney pots re-bedded or re-flaunched where the mortar has deteriorated.
Where scaffolding is required to access the stacks, it is advisable to coordinate these works with other high-level maintenance, such as general roof repairs, to minimise disruption and reduce overall access costs.